PRINT

Nepal: Tamakoshi V Hydroelectric Project

GRANT SUMMARY INFORMATION

SPECIAL FUND TYPE
PPSF Grant
MEMBER
Nepal
SECTOR
Energy

FINANCING

APPROVED AMOUNT
USD900,000

TIMELINE

APPROVAL DATE
January 17, 2019

DESCRIPTION

The proposed project is a 101MW run-of-river hydroelectric plant designed to be operated as a lower structure of a cascade. The project objectives are to reduce the supply and demand gap by providing additional power to the national grid and to help stabilize the grid by contributing to meeting the daily peak demand. The Special Fund will be used to: 1) mobilize a Panel of Technical Experts to ensure the soundness of the engineering design; and 2) enhance quality of project preparatory activities and processes to meet the Bank’s Environmental and Social Policy.

Home What We Do Project List Nepal: Tamakoshi V Hydroelectric Project